Rehabilitation of gas pipeline, Kazakhstan
Product: BUTYLEN-AS30
Country: Kazakhstan
Client: Azia-Resurs Ltd.
Operator: ICA
Project type: Rehabilitation
Project scope: Gas pipeline, 180 km, DN1200-1400 (49 - 56")
Time period: 2014-2015
Full pipe rehabilitation of approx. 180 km section of the CAC gas pipeline Uzbekistan-Kazakhstan-Russia. Challenges were extrem temperature fluctuations (very hot summer, very cold winter). BUTYLEN-AS30 corrosion protection tapes withstand high temperature changes. They were applied with DEKOMAT®-11 wrapping machine around welding seams.